FlameOut has completed a number of annual and bi-annual guy wire inspection, re-tensioning and verticality checks to a number of flare stacks and mast structures in the UK.
All activities were undertaken in accordance with the recommendations set out in the current BS EN Standard (Eurocode 3), and the specific design criteria pertaining to each flare stack or mast structure.