FlameOut was awarded the Order and has since successfully completed the manufacture, testing and supply of an engineered guy wire package to a number of flare stacks in Saudi Arabia. The engineering of one of the packages included a structural design appraisal of the flare stack’s existing elevated anchorage lugs against the current relevant design code (Eurocode 3). This structural design analysis included an assessment of the original misalignment of the elevated lugs in relation to the guy wire anchor blocks, to ensure that designed capacity of the elevated lugs would not be exceeded.